Keeping your Grassroots Gladiators Looking Match Ready!

Disclaimer:

Most fabrics discolour due to staining by substances such as mud & grass which will not always be entirely removed by washing. Soaking garments as soon as possible can help to reduce discolouration.
    1. Remove as much mud from the garment as possible after play and BEFORE washing / soaking.
    2. DO NOT leave kit bundled (Kitbag, Car Boot, etc..) The sooner the kit can be washed the less chance of staining
    3. Always follow detergent manufacturer’s instructions. Heavy stains may require repeated rubbing & soaking with stain removers.
    4. Avoid using bleach. This will damage fabrics.
    5. DO NOT exceed washing temperature of 30 Degrees wash cycle otherwise this will ‘set in’ stains rather than remove them, and cause damage to the garment itself! Where possible wash garments inside out
    6. DO NOT Tumble Dry! Allow garment to dry naturally.
    7. DO NOT Iron.
    8. RAINWEAR garments must NOT BE washed. Instead they should be wiped down with a wet cloth. A washing cycle will affect some forms of printing & transfers. Washing causes deterioration and ‘peeling’. It also starts to breakdown the water resistant layering of the garment. It is recommended that a water repellent spray is applied to the garment at regular intervals.
    9. When washing ‘sublimated jerseys’, it is recommended to use a ‘colour catcher’ product to prevent colours from running into each other! (NB: Sublimated = if the inside layer of the garment is white but the outer layer is a different colour!)
    10. Some clothing contain choking hazards. Clothing with Zip pullers are not suitable for children under 4 years old.
These are bespoke GG Kits garments. They are robust and hardwearing but only if all care instructions are followed and users respect the garment. GG KITS Ltd do not accept any responsibility or liability for any garment damaged where the above instructions are not followed. Manufacturers are able to tell when garments are washed at too high temperature, as the material will go limp, colours fade, and any printing / transfers will start to peel away.

Easy Ordering

Request a quote and send us a few details. Once approved we will then work hard to produce an order for you to agree, then just sit back and let us do the rest!

Reliable Delivery

4-5 weeks for playing kits and 5-6 weeks for Training gear. All built to your spec with full customisation. Partner clubs also have access to an express service which can take 1-2 weeks off these timescales.

Inclusive Sizing

Simple sizing with lots of support in esuring you get the ‘fit’ you are looking for!

Premium Quality

We use modern, high-performance fabrics, for comfort and durability.